795 Windsweep Farm Road

795 Windsweep Farm Road, Thomaston, GA 30286


The Upson County Technology Overlay District Site presents a significant large-scale development opportunity in Thomaston, Georgia, encompassing approximately 1,443 acres with access to substantial electrical and utility infrastructure. Situated within Upson County's Technology Overlay District, the property is designated for by-right data center development, making it an attractive location for power-intensive industrial and technology operations. The site benefits from direct access to 230 kV and 115 kV transmission lines, with an injection study identifying potential transferable power capacity of 741 MW and 74.7 MW, respectively. Additional infrastructure includes an existing Windstream Wholesale fiber backbone and an on-site high-pressure natural gas pipeline operated by Southern Company Gas. Located approximately 45 miles from the Fayetteville campuses and within proximity to several regional power generation facilities, the property offers substantial acreage and infrastructure advantages for phased, large-scale development. With its technology-focused land use designation and access to multiple utility resources, the site represents an opportunity for data center developers and investors seeking a scalable development location in Central Georgia.

Property Highlights

  • Approximately 1,443 acres available for large-scale development

  • Situated within the Upson County Technology Overlay District

  • By-right data center development designation

  • Direct access to existing 230 kV and 115 kV electrical transmission lines

  • Injection study identifies approximately 741 MW of potentially transferable power on the 230 kV line

  • Additional 74.7 MW of potentially transferable power identified on the 115 kV line

  • Existing fiber backbone infrastructure provided by Windstream Wholesale

  • On-site 1,000 PSI natural gas pipeline operated by Southern Company Gas

  • Reported natural gas availability of approximately 50,000–80,000 Dth/day within 9–12 months

  • Proximity to regional power generation facilities, including the Edward L. Addison Generating Plant, Piedmont Green Power, Smarr Energy Center, and Scherer Power Plant

  • Conceptual site plan illustrating multiple 250,000 SF data center building footprints

  • Preliminary development plan incorporates potential substations, power generation facilities, and stormwater management areas

  • Soil and water assessments identify wetlands, streams, and other environmental considerations for future development planning

  • Significant acreage supports the evaluation of phased development and expansion opportunities

  • Suitable for data center developers, technology infrastructure operators, and investors evaluating large-scale, power-intensive development projects

For more information, please contact:

Andy Walsh at (804) 308-1603 or AndyW@SugarOak.com‍ ‍

Allan Sharrett at (804) 308-8825 or AllanS@SugarOak.com‍ ‍

John Simpson at (770) 409-9700 or JohnS@SugarOak.com‍